Professional Diving Services
03 9775 0998
Toggle navigation
Home
Professional Divers Training Academy
Professional Marine Science Services
Smarter Safer Solutions
Our Profile
Professional Divers Group
History
Systems
Key Personnel
Capabilities
Construction and Demolition
Structure Surveys and Reporting
Pile Protection and Rehabilitation
Environmental Surveys
In-Water Ship Survey, Maintenance and Repairs
Vessel Salvage and Repair
Heritage Surveys
Contaminated Environments
Tank Inspections and cleaning
Cutting and Welding
Non-destructive Testing
Diver Controlled Dredging
Resources
Commercial In Survey Vessels for Hire
Crane
Remotely Operated Vehicle (ROV)
Height Safety
Confined Space
OH&S Training
Sales and Service
Projects
Queensland Bridge Inspections
Hobson’s Bay Main Sewer (HBMS) Protection Plate Project
Eden Wood Chip Mill Pile Rehabilitation Works
HMS Sirius and Kingston Jetty Norfolk Island
Station Pier Pile Repairs
Melbourne Water Eastern Treatment Plant
SL Patterson Berth, Port of Portland Maintenance Works
Bushy Creek Waste Water Treatment Plant
Salvage of the vessel Argo from the Murray River
West Channel Beacons
Lake Buffalo Condition Assessment
GMW Mildura Weir
Taronga Zoo Maintenance Contract
Fire Water Storage Tank Survey
Beacon Cove Pile Repair Works
Central Pier Pile Remediation
Windsor Bridge Archaeological Excavations
Mount Buller Water Storage Tanks Inspections
Box Hill Aquatic Centre
Cardinia & Greenvale Reservoir Gate and Valve Upgrades
Eildon Pondage Bulkhead Installation
Salvage of the vessel Julian from the Port of Portland
Balranald Weir Structural Inspections
ROV Survey of M24 Japanese Midget Submarine
Projects Archive
Coober Pedy, Dam Maintenance and Repairs
McKay Power Station Head Race Tunnel Works
Lake Eildon Debris Removal
ROV Inspection of Outfall Pipe
Origin Energy Fire Water Storage Pond Maintenance
Lower Molonglo Waste Water Treatment Facility
Methane Reactor Contaminated Diving Works
Mildura Wharf Surveys
Micronesian Chief Installation of Cofferdam Box
Patterson Lakes Tidal Gates
Patterson Lakes Underwater Survey, Monitoring and Maintenance
Underwater Inspection of Silver Emily
Repair works for the Port of Melbourne Corporation
Channel Deepening
MCG water storage tank inspection
Installation of bioWAVE Energy System
Survey of Searoad Ferries’ MV Sorrento
Robinvale
Tea Garden Creek Weir Refurbishment
Gallery
Data Sheets
Underwater Welding
Dangers of Delta P (Differential Pressure) in Diving
Marine Borers
Accelerated Low Water Corrosion (ALWC)
Media
Latest News
Newsletters
Media
Contact
Search for:
Confined space with ladder
February 12, 2020
341 × 219
Confined Space
Previous Image
Commercial diving services