Gellibrand Pier Pile Protection
Gellibrand Pier Pile Rehabilitation
The Gellibrand Pier Pile Rehabilitation project saw Professional Divers complete a pile rehabilitation job in a very short timeframe around shipping, oil berth activities and changing weather conditions. Early on in the four month project the number of pile strengthening system installations tripled, but Professional Diving Services still managed to complete the works to a very high standard, within the original timeframe and within the allocated budget.
The total of repairs including:
- 668 sq/meters of Denso 100 Series repairs
- 370 lineal meters of Denso 70 Series repairs
- 100 lineal meters of Denso 500 Series repairs
- 46 galvanic anodes